Volume = length × width × depth
A slab 6m × 4m × 0.1m = 2.4 m³. Change millimetres into metres first. 100mm = 0.1m.
Ordering
Concrete comes in steps of 0.2 m³. Round up. Running out costs a lot more than having a bit extra.
Powered by Stratified LearningOrdering a concrete truck for a shed slab
Cubic metres for slabs, footings and truckloads.
How the words are written:
Matched to your check-inA slab 6m × 4m × 0.1m = 2.4 m³. Change millimetres into metres first. 100mm = 0.1m.
Concrete comes in steps of 0.2 m³. Round up. Running out costs a lot more than having a bit extra.
Two quick questions to show you have it.
1. A slab is 5m × 4m × 100mm. How much concrete?
2. A footing is 12m × 0.4m × 0.5m. Volume?
Every version is generated from this lesson. Print, save as PDF or export to Word.
Student worksheet
Standard tasks with writing space.
Trainer answer sheet
Every task with model answers.
Differentiated worksheet
Scaffolded with sentence starters and hints.
Picture supported
Visual cues beside each task.
Revision worksheet
Shorter recall set for a quick review.
Assessment worksheet
Marked tasks with a score box.