Before the bucket goes in
Get the Before You Dig plans. Dig by hand or use a vacuum to find the pipe or cable. Then mark on the ground where it is.
Ground support
A trench 1.5m deep or deeper needs support. That means shoring, benching or battering. There must also be a safe way in and out within 9m of every worker.
- Spoil kept at least 600mm back from the edge
- Atmosphere tested where there is any risk of gas
- Never enter an unsupported trench to 'grab one thing'
